Détail de la notice
Titre du Document
Cost contingency as the standard deviation of the cost estimate
Auteur(s)
ROTHWELL Geoffrey
Résumé
Traditional cost contingency estimation relies heavily on expert judgment based on various cost-enginnering standards. This article compares project stages, accuracy ranges, and cost contingencies recommended by the Association for the Advancement of Cost Engineering International and tlie Electric Power Research Institute. It shows that current guidelines are consistent with contingencies equal to the standard deviation of the cost estimate. It suggests how this standard deviation can be derived from a confidence level (e.g., 80 percent) for a given accuracy (e.g., ±10 percent) for normal and lognormal probability distributions.
Editeur
Association for the Advancement of Cost Engineering
Identifiant
ISSN : 0274-9696
Source
Cost engineering (Morgantown, W. Va.) A. 2005, vol. 47, n° 7, pp. 22-25 [4 pages] [bibl. : 8 ref.]
Langue
Anglais
Pour les membres de la communauté du CNRS, ce document est autorisé à la reproduction à titre gratuit.
Pour les membres des communautés hors CNRS, la reproduction de ce document à titre onéreux sera fournie sous réserve d’autorisation du Centre Français d’exploitation du droit de Copie.

Pour bénéficier de nos services (strictement destinés aux membres de la communauté CNRS (Centre National de la Recherche Scientifique), de l'ESR français (Enseignement Supérieur et Recherche), et du secteur public français & étranger) :